True Value: Assessing and Optimizing the Cost of Computing at the Data Center Level

There are five main components to the cost of delivering computing in a data center: (i) the construction of the data center building itself; (ii) the power and cooling infrastructure for the data center; (iii) the acquisition cost of the servers that populate the data center; (iv) the cost of electricity to power (and cool) the servers; and (v) the cost of managing those servers. We first study the fundamental economics of operating such a data center with a model that captures the first four costs. We call these the physical cost, as it does not include the labor cost. We show that it makes economic sense to design data centers for relatively low power densities, and that increasing server utilization is an efficient way to reduce total cost of computation. We then develop a cost/performance model that includes the management cost and allows the evaluation of the optimal server size for consolidation. We show that, for a broad range of operating and cost conditions, servers with 4 to 16 processor sockets result in the lowest total cost of computing.

By: John Karidis, José E. Moreira, Jaime Moreno

Published in: RC24768 in 2009

LIMITED DISTRIBUTION NOTICE:

This Research Report is available. This report has been submitted for publication outside of IBM and will probably be copyrighted if accepted for publication. It has been issued as a Research Report for early dissemination of its contents. In view of the transfer of copyright to the outside publisher, its distribution outside of IBM prior to publication should be limited to peer communications and specific requests. After outside publication, requests should be filled only by reprints or legally obtained copies of the article (e.g., payment of royalties). I have read and understand this notice and am a member of the scientific community outside or inside of IBM seeking a single copy only.

rc24768.pdf

Questions about this service can be mailed to reports@us.ibm.com .