An Evaluation of Parallel Job Scheduling for ASCI Blue-Pacific

        In this paper we analyze the behavior of a gang-scheduling system that we are developing for the ASCI Blue-Pacific machines. Starting with a real workload obtained from job logs of one of the ASCI machines, we generate a statistical model of this workload using Hyper Erlang distributions. We then vary the parameters of those distributions to generate various workloads, representative of different operating points of the machine. Through simulation we obtain performance characteristics for three different scheduling strategies: (i) first-come first-serve, (ii) gang-scheduling, and (iii) backfilling. Our results show that both backfilling and gang-scheduling with moderate multiprogramming levels are much more effective than simple first-come first-serve scheduling. In addition, we show that gang-scheduling can display better performance characteristics than backfilling, particularly for large production jobs.

By: H. Franke, J. Jann, J.E. Moreira, P. Pattnaik, M.A. Jette

Published in: RC21559 in 1999

LIMITED DISTRIBUTION NOTICE:

This Research Report is available. This report has been submitted for publication outside of IBM and will probably be copyrighted if accepted for publication. It has been issued as a Research Report for early dissemination of its contents. In view of the transfer of copyright to the outside publisher, its distribution outside of IBM prior to publication should be limited to peer communications and specific requests. After outside publication, requests should be filled only by reprints or legally obtained copies of the article (e.g., payment of royalties). I have read and understand this notice and am a member of the scientific community outside or inside of IBM seeking a single copy only.

RC21559.ps

Questions about this service can be mailed to reports@us.ibm.com .